Overview
Laminate flooring installation involves laying interlocking, floating planks over a prepared subfloor and underlayment, without nails or glue holding the planks to the floor itself. It's a popular first-time flooring project because the click-together boards are DIY-friendly, forgiving of small measurement errors, and don't require special trade skills — making it realistic for a homeowner who is comfortable with basic tools and willing to spend a weekend on the project.
Tools & materials
- Laminate flooring planks (add 10% extra for cuts and waste)
- Foam or film underlayment (with vapor barrier if installing over concrete)
- Tape measure, pencil, and straightedge or chalk line
- Circular saw, jigsaw, or laminate flooring cutter for straight and notch cuts
- Tapping block and rubber mallet or hammer
- Pull bar for the last row
- 1/4 to 3/8-inch spacers for expansion gaps
- Utility knife
- Moisture meter (especially over concrete subfloors)
- Transition strips, shoe molding, or quarter-round trim
- Safety glasses and dust mask
Steps
- Let the laminate boxes acclimate in the room where they'll be installed for at least 48 hours so the planks adjust to the home's temperature and humidity.
- Remove baseboards, shoe molding, and any old flooring, then check that the subfloor is clean, dry, flat, and free of debris (no more than about 1/8-inch variation over 8 feet).
- Test moisture on concrete subfloors with a moisture meter and address any issues before proceeding.
- Undercut door jambs and casings with a handsaw so planks can slide underneath for a clean look.
- Roll out the underlayment (with a vapor barrier over concrete), butting seams and taping them per the manufacturer's instructions.
- Snap a chalk line or measure to plan your starting row along the longest, straightest wall, and dry-fit the first row to check the layout.
- Place 1/4 to 3/8-inch spacers against the wall and lay the first row, connecting the short ends of the planks at a slight angle until they click.
- Continue row by row, staggering the end joints of adjacent rows by at least 6-8 inches for a natural look and structural stability.
- Use a tapping block and mallet to close gaps between planks without damaging the locking edges, and a pull bar to snug up the final row.
- Cut planks to fit around doorways, vents, and corners using a jigsaw or laminate cutter, keeping the expansion gap consistent on all sides.
- Once the floor is fully laid, remove the spacers, reinstall or add new baseboards and transition strips, and fill any expansion gaps at transitions with matching caulk.
Safety warnings
- Wear safety glasses when cutting or tapping planks, since chips can fly off the laminate surface.
- Wear a dust mask or respirator when cutting laminate with a saw, and work in a ventilated area.
- Use knee pads if you'll be kneeling for extended periods during installation.
- Handle utility knives and saw blades carefully, cutting away from your body and keeping blades sharp to reduce slipping.
- Wear work gloves when removing old flooring or handling planks with sharp edges.
- Keep the work area well-lit and free of tripping hazards like loose tools, cords, or plank offcuts.
- If you're removing old vinyl tile, sheet flooring, or a black mastic adhesive layer before laying laminate and the home predates the 1980s, treat it as a possible asbestos source - don't sand, dry-scrape, or saw through it; a certified lab test kit (or a pro) can confirm before you disturb it.
When to call a pro
- The subfloor has soft spots, visible rot, or sags more than 1/8 inch over an 8-foot span even after basic leveling attempts.
- You find water staining, a musty smell, or suspected mold underneath the old flooring.
- The existing subfloor needs structural repair or replacement of damaged plywood/OSB sections.
- You're installing over a large open floor plan with complex transitions, stairs, or multiple rooms of differing heights.
- Moisture meter readings on a concrete subfloor exceed the laminate manufacturer's maximum allowed level.
- The layout involves many intricate cuts around cabinetry, built-ins, or curved thresholds beyond your comfort level with a saw.
- The old flooring, backing, or adhesive you're removing tests positive (or is suspected) for asbestos - stop and call a certified abatement professional rather than continuing removal yourself.
Cost estimate
Roughly $500-$1,500 for a typical room (materials plus tools/underlayment), or about $1.50-$5 per sq ft in materials alone if you already own basic toolsSources
- How to Install Laminate Flooring Like a Pro — Bob Vila
- How to Install Laminate Flooring — Lowe's
- Guide to Installing Laminate Flooring (DIY) — Family Handyman
- How To Install Laminate Flooring: Step-By-Step Guide — Today's Homeowner